IPO Alert: Green Ventures limited is going to issue 31,25,000 to general public from chaitra 8

IPO Alert | Nepal share market | Hydropower | Green Ventures | Upcoming IPO 
14-Mar-2022
Kathmandu

IPO (Initial public offering) confirmed and likely to open from Chaitra 8 , 2078. (22 March 2022)

Green Ventures limited is going to issue 6,250,000 ( Sixty two lakh fifty thousand ) IPO ( initial public offering) shares worth of 625,000,000 ( Sixty two Crore and fifty lakh) with base price of Rs. 100 in 2 phases.

1. Okhandhunga & Ramechhap District locals.
2. General public 

First Phase: 

Green Ventures limited (GVL) issued to Locals okhandhunga and Ramechhap District people affected on first phase which has been already completed. 

In the first phase of issuing GVL issued 31,25,000 units IPO shares and are purely for local residents of okhandhunga and Ramechhap District.

Second Phase :

Green Ventures limited (GVL) is going to issue initial public offering (IPO) to the general public on second phase. The total 31,25,000 units will be for general public.

Date to apply  : Chaitra 8

Bifurcation of kittas as below:

Total issue unit: 31,25,000
3% Employee   : 93,750 
5% Mutual Fund: 1,56,250
Remaining General public: 28,75,000

Who is the issue manager of Green Ventures Limited?
Laxmi capital Market limited 

After the initial public offering promoters share vs general public ratio will be 80% vs 20%.

How much to apply?
Minimum 10 kitta to maximum 1,000 kitta could be.

Who can apply?
Everyone 

When the issuing date?
From chaitra 8

Rating of Green Ventures Limited IPO issuing? 
BB
By CARE NEPAL LIMITED 

About Green Ventures limited:

The Likhu-IV Hydroelectric Project is planned as a run-of-river scheme with an installed capacity of 52.4MW utilizing a design discharge of 26.70m3/s and gross head of 221.27 meters.
The headwork consists of 36m wide un-gated weir with 2 under- sluice bays to safely discharge flows during monsoon period/floods. The full supply level is fixed at EL.1023.00 m.a.s.l and 2 intake openings are provided at the head regulator to draw the required design discharge. Two surface desanders L=80m & W=10m removing the particle size lesser than 0.2mm is proposed. The 4024.50 m long tunnel will convey the design discharge from the end of a power duct to the pressure shaft. The surge shaft is located at end of headrace tunnel. The tunnel is D- shaped having 3.8 m dia. with concrete lining for the initial length of 3924.50 m and the remaining 100 m long portion of HRT is steel lined with 3.40 m dia circular section with concrete backfill around the steel lining. The powerhouse is expected to be founded mainly on overburden material. Water passing through the turbines is then discharged back into the Likhu River through a 70m long tailrace channel. The total gross annual energy generation estimated at the normal load condition is estimated as 314.78 GWh.
The power generated from the plant will be evacuated through an approximately 19 Km long 220 kV Single Circuit Transmission line at New Khimti Substation, Kirnetar Ramechhap. ( source: Green Ventures website)


You may also like :
How to check IPO/FPO Allotement results in Nepal


Emerging Nepal limited IPO


Tags:

#Greenventures #Greenventurelimited #GreenventureIPO #Hydropower #laghubittya #IPONepal #Upcomingipo #Nepalsharemarketupdates #Stockmarket #nepse #sebon #IPOAllotment #IPOnews

Post a Comment

0 Comments